Lead-Based Paint Activities and Project Notification

Regulated Activities

When regulated activities are to occur, a Lead-Based Paint Project Notification must be submitted six (6) working days prior to the start of the regulated activities.

Any activity that disturbs painted surfaces in residential structures and child-occupied facilities built before 1978 is subject to the regulations. These activities include, but are not limited to the following:

  • Testing paint for the presence of lead
  • Sanding
  • Scraping
  • Window replacement
  • Removal of architectural features (e.g., fireplace mantle, interior and exterior trim, stair rails and banisters, etc.)

Activities prohibited by the regulations include:

  • High speed abrasive removal of paint (e.g., use of grinders, needle guns, sand blasting, etc.)
  • Open flame burning or torching to remove paint
  • Use of heat guns that exceed 1100 degrees Fahrenheit

The Project Notification form can be found HERE

ATTN: Building Permit Office Guidance