Types of General Permits and Notice of Intent Forms

Due to the circumstances surrounding the state’s response to the COVID-19 situation and for your convenience and safety, EPD is temporarily accepting electronic applications. You can submit electronic applications for general permit coverages here.

Air General Permits
Oil Production General Permit

MSOPGP Final Permit
OPGP Public Notice Template and Instructions
OPGP NOI Application Form Instructions
OPGP NOI – Section A – Facility Information
OPGP NOI – Section B – Facility Wide Emissions Information
OPGP NOI – Section C – External Combustion Sources
OPGP NOI – Section D – Internal Combustion Engines
OPGP NOI – Section E – Tanks
OPGP NOI – Section F – Flare
OPGP NOI – Section G – Compliance Plan
Request for Termination of Coverage

Stormwater General Permits
(no other media included)
Baseline (Industrial) Stormwater

NOTE:  Do not submit recoverage applications for Baseline Stormwater General Permit coverages at this time.   Upon reissuance of the general permit, coverage holders will be notified with a copy of the new recoverage form and letter of instruction.

The Baseline General Permit was reissued on November 17, 2015. Active coverage recipients were sent a Letter of Instruction package, which outlined options/instructions for continuing or terminating coverage, summarized changes incorporated in this renewal and transmitted copies of the Re-Coverage and Termination Forms. Recipients have 45 days from the date of the instruction letter to respond. Facilities with an active coverage that did not receive an instruction letter should contact their MDEQ permitting representative. If you do not know your permitting representative, you can click here and enter the nine digit coverage number (MSR00_ _ _ _) listed on your coverage certificate in the Permit Number query box, then click on the “Search ” button. Click on the :AI ID” number corresponding to your facility in the table displayed under “Results:.” The name and phone number of your permitting representative will be listed in the table entitled “Office of Pollution Control Contacts.”

General Permit
Forms Package (must be implemented by April 1, 2016)
State SWPPP Guidance Manual
EPA SWPPP Guidance Manual
Industrial Activities Requiring NPDES Permit Coverage
No Exposure Certification (included in Forms Package)
No Exposure Certification Guidance Manual

MS4 (Municipal) Phase II Stormwater

(Contact Florance Bass 601-961-5614)

Multimedia and Multipurpose General Permits

(stormwater, process water, air emissions, etc.)

Hot Mix Asphalt

Hydrostatic Test

Mining

Ready-Mix Concrete
(Contact Sherryl Couch 601-961-5767)

Wet Deck Log Spray
(Contact Rajeev Gupta 601-961-5623)

Pesticide
(Contact Becky Williams 601-961-5580)

Dry Litter Poultry Animal Feeding Operation (AFO)

Multimedia Concentrated Animal Feeding Operation (CAFO)

Solid Waste General Permits

New facilities seeking Stormwater Coverage should contact the Solid Waste Branch

Land Disposal

New facilities seeking Stormwater Coverage should contact the Solid Waste Branch

Municipal Solid Waste Transfer Station

Rubbish

Solid Waste Management Stormwater

  • General Permit (Under Construction)
  • Notice of Intent (NOI) Form (Under Construction)
  • Re-Coverage Form

Vegative Debris and Untreated Wood Waste Composting

Process Water General Permits

New facilities seeking Stormwater Coverage should contact the Service Branch

Underground Storage Tank Remediation

City of Jackson

Other Forms
Request for Transfer of Permit, General Permit Coverage and/or Name Change

Mailing Address
PO Box 2261
Jackson, MS 39225

Physical Address
515 East Amite Street
Jackson, MS 39201